Home / Swindon Court

Case Study

Swindon Court

The installation of a SolarEdge Solar PV System

Working on behalf of Bright Future Energy Group, Total Electrical Contractors Ltd. successfully delivered the electrical installation for a bespoke solar PV system at Swindon Court. This project featured the installation of high-efficiency 500W Eurener panels, chosen for their durability and performance.

The roof presented a number of unique challenges due to its complex structure and limited accessibility. Our experienced team carefully planned and executed the installation to ensure all components were securely mounted and optimally positioned for maximum solar gain, while maintaining strict compliance with safety and building regulations.

Despite the logistical constraints, the project was delivered on time and to a high standard, showcasing our capability to manage technically demanding solar installations. This collaboration with Bright Future Energy Group highlights our shared commitment to advancing sustainable energy across a variety of building types.

 

Installation Elements

Solar PV

Invertor

Wireless Reporting

LV Distribution

Discover. Create. Connect.

Our scope of works included:

  • Photovoltaic panels.
  • Solar Edge invertor.
  • DC isolators.
  • Primary containment.
  • LV Distribution
  • PV optimisers.

“Reliable, Efficient and competent”

We have used Total Electrical for a number of office and laboratory design and build projects, Their service has always been professionally managed and delivered to a high standard. Projects are always delivered on time, Right first time.

Mike Pendleton

Director - Total Projects (UK) Ltd

Other Solar Case Studies

Multi Storey Car Park – Harwell Campus

Electrical Installation

Multi Storey Car Park – Harwell Campus

Learn more
Chinnor Library Solar

Electrical Installation

Chinnor Library Solar

Learn more
Bicester Fire Station

Electrical Installation

Bicester Fire Station

Learn more